Energy

Every outage finding shapes the next outage scope.

Our power generation FMECA software checks inspection findings, forced outages and work orders against your FMECAs and outage scope. By the next outage, every item has its evidence.

6 months → days
of RCM on one machineGlobal Cement Producer
Years → weeks
to organize fleet strategiesMajor Oil & Gas Operator
93%+
accuracyrated by senior engineers
30%+
less engineer time on FMEA workproduction deployments
How it works

Every trip reaches the unit FMECA before the next outage.

Outage reports, inspections and failure reports are matched to your FMECAs and RCM. Your system engineer signs off a short list each week.

Drafting 3 changes: oil analysis on both, an outage check.
Approvedby the system engineer.
Re-rating both feed pumps to IEC 60812.
Saved BFP-2B FMECA v2.2. BFP-2A follows.
IEC 60812ISO 55001ISO 14224SAE JA1011IEEE 493NERC CIP
Rotating-equipment evidence

6 months of RCM on 1 machine, compressed to days.

“Technically, it convinces me. I know this is the future of maintenance management. We spent six months on one machine’s RCM and still aren’t finished. This compresses that to days.”

Maintenance Coordinator, Global Cement Producer, Kiln & Mill RCM

Generation and network leaders

For leaders accountable for availability, risk, and capital.

Generation and network leaders, asset management, reliability, outage managers and engineering authorities.

Brownfield

Operating units

Work orders and condition data test every maintenance assumption.

Greenfield

New units and repowering

A reliability baseline from OEM and commissioning data, updated as you run.

How you get there

One unit this quarter. The whole fleet next year.

Start with the unit with the most forced outages. Its sister units start ahead.

MONTH 1

Start with your FMECA for one unit

Bring one unit's last outage report and work orders. Unit FMECA in days.

MONTH 3

Findings and outages flow in weekly

Your system engineer approves each change once. Every unit of the same design updates.

YEAR 1

Every unit on one living strategy

Fewer unmatched findings each month. The next outage is just another week.

Questions

Energy reliability questions, answered.

On the evidence side. Every change, reviewer decision and record update is attributed, versioned and exportable, ready for CIP-010 change-management and CIP-011 information-protection evidence wherever Tacit AI touches BES Cyber System information. Deployment runs inside your boundary with RBAC and MFA through your identity provider.

Yes. Tacit AI builds source-linked failure modes, consequence classifications and task logic for rotating equipment. P-F intervals are calculated from inspection, condition, event-timing and operating-context data, and every data gap is shown, never papered over.

Every failure and task is organized against the outage scope, with its source. Outage planners and engineering authorities sign off consequence assumptions, online-work options, deferral logic and dependencies before any item enters the controlled plan.

Yes. Tacit AI organizes starts, load history, inspections, events and engineering sources into one view of cycling exposure. Life calculations run on your operating and condition data with your engineering model, and the responsible specialist signs them off.

Mixed fleets share one taxonomy, with each OEM, model and configuration kept distinct. Duty, environment and maintenance-policy boundaries are preserved, so local engineering owners accept, limit or reject every comparison and reuse.

Bring one unit’s outage history.
See what your FMECA misses before the next outage.

One unit, judged by your system engineer in 30 minutes.

Cookie settings
Necessary cookies keep the site working and are always on. Analytics and advertising cookies are only set if you allow them. You can change this at any time. Privacy policy
Necessary
Allow Necessary cookies.
Analytics
Allow Analytics cookies.
Advertising
Allow Advertising cookies.