Defense

Every test and field report strengthens your FMECA.

Our defense FMECA and RCM software checks test results, deficiency reports and field reports against your FMECA, air-gapped if required. Your R&M lead approves a short weekly list.

93%+
accuracyrated by senior engineers
8×
faster FMEA generationTop 20 Global OEM
10,000+
reference FMEAsDFMEA, PFMEA, FMECA
30%+
less engineer time on FMEA workproduction deployments
How it works

Deficiency reports reach the FMECA inside your boundary. R&M approves.

Qualification tests, nonconformances and field reports are matched to your FMECA, PFMEA and fault trees. Your R&M lead approves each change, air-gapped if required.

Drafting 3 changes: a sealed connector, a thickness check.
Approvedby the R&M lead.
Recomputing harness criticality per MIL-STD-1629A.
Saved FMECA-H3 v2.1. The cut set is re-checked.
MIL-STD-1629AMIL-STD-882EMIL-HDBK-338BDOD RMF
Program and sustainment leaders

For leaders who own availability, sustainment cost and program risk.

Program leads, R&M, product support and system safety, inside your security boundary.

Fielded systems

Focus scarce sustainment capacity

Recurring failures, documentation gaps and task changes, shown by platform and configuration.

Development programs

Deliver contract-specific analysis

A traceable FMEA from approved design sources, to the required method.

How you get there

One platform system first. Every platform after.

Start with the platform system with the most deficiencies. Every platform after starts ahead.

MONTH 1

Start with your platform FMECA

Bring one platform's records and technical data. Platform FMECA in days.

MONTH 3

Records and deficiency reports flow in weekly

Your R&M lead approves each change once. Every matching platform updates.

YEAR 1

Every platform on one evidence baseline

Fewer unmatched deficiency reports each month. The next readiness review is just another week.

Questions

Defense authorization questions, answered.

Yes. Every failure mode, criticality input, maintenance interval and spares recommendation keeps its source reference, document revision, extracted context, assumptions and reviewer decision. Phase 1 tests that provenance against your program’s required evidence chain and markings.

Yes. Air-gapped deployment runs on locally hosted models with no external dependency. Compute, identity, logging, support and update paths are defined with your security team, ready for your Authorizing Official.

Authorization is granted per environment by your Authorizing Official through your RMF/ATO process. Tacit AI delivers the architecture, controls and documentation that process requires.

Tacit AI flags the gap or labels the assumption. It never invents failure-rate data, criticality inputs, configuration applicability or operational conclusions to complete a record.

The update source, transfer path, verification, rollback, configuration record, and reauthorization impact are defined with the customer. No update process is assumed across a protected boundary.

Bring one platform’s records.
See which deficiencies your FMECA has not absorbed.

One platform system, judged by your R&M lead in 30 minutes.

Cookie settings
Necessary cookies keep the site working and are always on. Analytics and advertising cookies are only set if you allow them. You can change this at any time. Privacy policy
Necessary
Allow Necessary cookies.
Analytics
Allow Analytics cookies.
Advertising
Allow Advertising cookies.